The development of eco-friendly solutions based on silanes and nanoparticles for buildings and heritage consolidation
PN-IV-P7-7.1-PTE-2024-0522 (47PTE/2025)

The structures of buildings and monuments (those belonging to cultural heritage being a particular case of interest) are susceptible to deterioration caused by natural forces (such as weather, earthquakes and erosion), but also those resulting from anthropogenic actions. Climate change amplifies these risks, underlining the urgency of implementing strengthening measures to mitigate the impact on the environment.
Project goal

The goal of the project “Development of ecological solutions based on silanes and nanoparticles for the consolidation of buildings and monuments” (NanoConsol) is the transfer and development of a consolidation technology (based on innovative nanomaterials with self-repairing properties and antimicrobial effect), dedicated to different types of materials in the composition of buildings and monuments (especially immovable heritage objects), to an economic agent with experience in creating and applying solutions for the consolidation of such objects, in order to increase its economic competitiveness, as well as its implementation in target sites, in an integrated monitoring/consolidation technology, with the ultimate goal of achieving a viable technology for the consolidation of heritage buildings.
Contracting authority: Executive Unit for Financing Higher Education, Research, Development and Innovation (UEFISCDI)
Implementation period: 05/05/2025-04/05/2027
Total budget: 1.896.075 lei
Value from the state budget: 1.496.075 lei
Total budget for the Coordinator POPP & Asociații: 1.149.300 lei (400.000 lei cofinancing)
Project director: Dr. Mădălin Vasile COMAN
Budget for the partner ICECHIM: 373.275 lei
Project responsible: Dr. Habil. Radu Claudiu Fierăscu
Budget for the partner National University of Science and Technology POLITEHNICA Bucharest: 373.500 lei
Project responsible: Dr. Denisa FICAI
Partner 2: National University of Science and Technology POLITEHNICA Bucharest
Project responsible: Assoc. Prof. Dr. Eng. Denisa FICAI

The project is intended to support compliance with Article 3(3) of the Treaty on European Union (which provides that the Union “shall ensure that Europe’s cultural heritage is protected and enhanced”), and through Article 167(2) undertakes common actions leading to “the conservation and safeguarding of cultural heritage of European importance”). At the same time, although the legislative framework exists (either through the adoption of international regulations by national legislation or through the development of its own specific legislative measures), cases of buildings belonging to the immovable cultural heritage that are at risk or that have, in the meantime, disappeared can often be encountered.
Preliminary activities for technology validation at industrial level.
Implementation period: 05.05.2025-31.12.2025
Activities:
A1.1. Study on the transfer of validated laboratory technology to industrial scale;
A1.2. Study and analysis of the possibilities of optimizing the synthesis/processing process of inorganic materials to obtain nanomaterials with self-repairing properties and antimicrobial effect on an industrial scale;
A1.3. Synthesis and characterization of inorganic materials for technology;
A1.4. Study and analysis of optimization possibilities of polymer suspensions with consolidation effect;
A1.5. Obtaining solutions with a consolidating role optimized for integration into technology;
A1.6. Design of the functional model for the implementation of the technology at the industrial level and start of the experimental works;
A1.7. Results and project dissemination.
Validation of the proposed technology in the industrial environment.
Implementation period: 01.01.2026-31.12.2026
Activities:
A2.1. Development of initial referential and of technological sheet;
A2.2. Experimental study on the functional model regarding the optimization of technological parameters;
A2.3. Validation of the technology by third parties;
A2.4. Pilot installation design and development (part I);
A2.5. Protecting industrial property rights (development of a patent application);
A2.6. Results and project dissemination.
Demonstrating the efficiency of technology in the industrial environment.
Implementation period: 01.01.2027-04.05.2027
Activities:
A3.1. Finalizing the pilot installation design and development;
A3.2. Implementation of the consolidating solution in the pilot installation. Application of the consolidating solution in the target sites;
A3.3. Pilot plant experiments to optimize operating parameters;
A3.4. Demonstration of the efficiency of the technology implemented in the industrial environment by characterizing objectives post-treatment;
A3.5. Development of the final technical specification for the integrated technology demonstrated at industrial level;
A3.6. Results and project dissemination.